Where the Trains Catch the Spray, and the Talks Stalled on the Bridge

Where the Trains Catch the Spray, and the Talks Stalled on the Bridge

Rhodes's Cape-to-Cairo dream, a steel arch over the Zambezi gorge, and the failed 1975 peace talks.

📍 Victoria Falls, Matabeleland North

HistoryTechnologyLandmarksPolitics

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • Cecil Rhodes proposed the Victoria Falls Bridge as part of his Cape to Cairo railway plan.
  • The Cape to Cairo railway was meant to link British-controlled African colonies in one continuous line from Cape Town to Cairo.
  • Rhodes died of heart failure on 26 March 1902, aged 48, at Muizenberg in the Cape Colony.
  • Rhodes died before construction of the bridge began and never visited Victoria Falls.
  • Rhodes reportedly told the engineers to "build the bridge across the Zambezi where the trains, as they pass, will catch the spray of the Falls."
  • The bridge was sited just below the Boiling Pot so that spray from the falls would reach passing trains.
  • The bridge was designed by George Andrew Hobson of Sir Douglas Fox and Partners.
  • Ralph Freeman assisted with the stress calculations and later became the principal designer of the Sydney Harbour Bridge.

Read the story

Cecil Rhodes never saw Victoria Falls. He died in 1902, before work on the bridge began. But he knew how it should feel. He reportedly told the engineers to build it across the Zambezi "where the trains, as they pass, will catch the spray of the Falls."

It was a showman's instruction attached to an emperor's dream. Rhodes wanted a railway running from the Cape to Cairo, stitching British colonies into one line of steel. The Zambezi gorge stood squarely in the way.

So the crossing went just below the Boiling Pot, where the mist drifts downstream. George Andrew Hobson of Sir Douglas Fox and Partners designed a single parabolic arch. The steel was prefabricated by the Cleveland Bridge and Engineering Company in Darlington, England, shipped to Beira in Mozambique, and hauled inland by rail.

Work began in 1904. With the river 128 meters below, crews pushed the arch out from both cliffs as anchored cantilevers, two arms of steel reaching toward each other over empty air. An electric cableway nicknamed the Blondin swung material across the gap, once even a locomotive in pieces. The job took about fourteen months. On September 12, 1905, Professor George Darwin, son of Charles Darwin, declared the bridge open.

Seventy years later, that same span marked a border, and a fault line. In August 1975, a South African Railways train stopped at its midpoint. Rhodesia's Prime Minister Ian Smith wanted the talks on Rhodesian soil; the nationalists, led by Bishop Abel Muzorewa and including Joshua Nkomo, refused. So each delegation sat on its own country's side of the carriage, with Vorster of South Africa and Kenneth Kaunda of Zambia mediating. After about nine and a half hours, the talks collapsed, each side blaming the other.

Rhodes built his bridge to join an empire. Its most famous meeting showed how far apart two sides could sit, in the same railway car, in the spray.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free