Key facts

  • Watts Bar Dam is a Tennessee Valley Authority dam on the Tennessee River in eastern Tennessee.
  • The dam is part of the Tennessee Valley Authority system created by Congress in 1933 during President Franklin D. Roosevelt's New Deal.
  • Franklin D. Roosevelt signed the Tennessee Valley Authority Act in 1933.
  • The first Tennessee Valley Authority board consisted of Arthur E. Morgan, Harcourt A. Morgan, and David E. Lilienthal.
  • Watts Bar Dam was planned and built as a multipurpose project for navigation, hydroelectric generation, and flood control.
  • The project was built to improve year-round navigation on the Tennessee River by replacing a river stretch that had been a barrier to dependable commercial traffic.
  • Construction of Watts Bar Dam began during the late 1930s and the dam was completed during World War II.
  • Watts Bar Dam includes a navigation lock as well as a hydroelectric powerhouse.

Read the story

Before Watts Bar Dam, this stretch of the Tennessee River had a human problem hiding inside a water problem: it was a barrier. If you wanted dependable commercial traffic moving year-round, the river here could simply refuse to cooperate.

That is the tension at the heart of Watts Bar Dam, a Tennessee Valley Authority project on the Tennessee River in eastern Tennessee. The TVA itself was born in 1933, when Congress created it during President Franklin D. Roosevelt’s New Deal and Roosevelt signed the TVA Act. Its first board — Arthur E. Morgan, Harcourt A. Morgan, and David E. Lilienthal — was handed an enormous assignment: use federal public works to change what the river could mean to the people living beside it.

At Watts Bar, the answer was not a single-purpose wall of concrete. The dam was planned and built for navigation, hydroelectric generation, and flood control. It would replace a troublesome river stretch with something more reliable, part of a continuous navigable system TVA was developing along the Tennessee River. Construction began in the late 1930s and was finished during World War II, with the kind of labor-heavy effort that defined the New Deal era. Thousands of workers found employment on TVA dam projects, and Watts Bar was one of the major ones.

But public works are never only about engineering drawings. The reservoir behind the dam — Watts Bar Reservoir — spread into the Tennessee River system and into tributary valleys, including parts of the Clinch and Emory river systems. Making that lake meant acquiring and flooding land, and relocating roads, rail lines, utilities, cemeteries, and families. A navigation lock and a hydroelectric powerhouse came with the project; so did upheaval.

And that is why Watts Bar Dam still matters. It remains in operation under TVA ownership and management, a major public-works landmark on the Tennessee River — a place where the New Deal did not just build on the landscape, but permanently rearranged how people moved through it, lived beside it, and drew power from it.