Where the Pipeline Meets the Sea

Where the Pipeline Meets the Sea

How Valdez became the seaward end of the Trans-Alaska Pipeline.

📍 Valdez-Cordova Census Area, AK

HistoryTechnologyLandmarksPolitics

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • Alyeska Pipeline Service Company is the company that operates and maintains the Trans-Alaska Pipeline System.
  • Alyeska Pipeline Service Company was created by the owner companies of the Trans-Alaska Pipeline System to build and run the pipeline project.
  • The Trans-Alaska Pipeline System runs from the Prudhoe Bay oil fields on Alaska’s North Slope to the Valdez Marine Terminal in Valdez.
  • The pipeline is about 800 miles long.
  • Valdez became the southern terminus of the Trans-Alaska Pipeline System because Alyeska’s marine terminal there was built to receive North Slope crude oil and load it onto tankers.
  • Construction of the Trans-Alaska Pipeline System began after Congress passed the Trans-Alaska Pipeline Authorization Act and President Richard Nixon signed it into law in 1973.
  • The Trans-Alaska Pipeline System was completed in 1977.
  • Oil first began moving through the Trans-Alaska Pipeline System in 1977.

Read the story

Stand in Valdez and the story comes down to a simple, enormous handoff: oil travels roughly 800 miles from the Prudhoe Bay oil fields on Alaska’s North Slope, and here, at Alyeska’s marine terminal, it meets the sea. That is how Valdez became the southern end of one of North America’s most famous engineering projects.

The change began with the 1968 discovery of the Prudhoe Bay oil field. That discovery created a pressing need to move large volumes of oil to an ice-free port. Valdez offered that southern port on Prince William Sound, and Alyeska Pipeline Service Company — created by the owner companies of the Trans-Alaska Pipeline System to build and run the project — became the company charged with making the whole thing work.

It did not happen quickly. The route and construction were delayed by major environmental and legal disputes before federal authorization finally arrived. Construction began after Congress passed the Trans-Alaska Pipeline Authorization Act and President Richard Nixon signed it into law in 1973. The system was completed in 1977. Oil began moving that same year.

And when it did, Valdez stopped being just the end of a line on a map. The Valdez Marine Terminal was built to receive North Slope crude oil and load it onto tankers. Its large crude oil storage tanks and tanker berths made the transfer possible, turning the terminal into one of the most visible pieces of infrastructure linking North Slope oil development to global oil shipping routes. In 1977, after the pipeline and terminal went into operation, the first tanker was loaded with North Slope oil at Valdez.

That visibility also carried consequence. Alyeska’s Valdez Marine Terminal was the departure point for the tanker Exxon Valdez before it ran aground on Bligh Reef in 1989. After the spill, oil-spill prevention and response systems in Prince William Sound were strengthened, including systems tied to tanker traffic from the terminal.

Alyeska still operates the pipeline and the terminal today. Even with volumes far below their late-1980s peak, the system remains a major part of Alaska’s oil infrastructure. And Valdez remains what this story made it: the place where an inland engineering feat becomes an ocean voyage.