# When the River Took Dayton, the Cash Register Factory Built a Fleet

In the 1913 flood, John H. Patterson turned NCR into a boatyard, shelter and hospital.

- Location: 1700 South Patterson Building (former NCR World Headquarters), Dayton, OH
- Topics: history, notable_landmarks
- Web page: https://tourpods.com/stories/when-the-river-took-dayton-the-cash-register-factory-built-a-fleet
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- The Great Dayton Flood took place from March 21 to March 26, 1913, as part of the Great Flood of 1913.
- Three storms brought 8 to 11 inches of rain within three days onto already saturated soil.
- The flooding came from the Great Miami River and its tributaries, including the Stillwater River, the Mad River and Wolf Creek.
- Dayton sits where five waterways meet and had flooded before, but John H. Patterson expected the 1913 flood to be much worse.
- On the morning of March 25, 1913, the south-side levees failed and downtown Dayton began to flood.
- Downtown Dayton flooded to a depth of up to 20 feet.
- On March 26, a gas explosion near Fifth Street and Wilkinson Street started a fire that destroyed most of a city block, and the floodwater kept firefighters from reaching fires.
- John H. Patterson, founder and president of the National Cash Register Company (NCR), turned the NCR factory into a relief station before the levee broke.

## Story

John H. Patterson had watched the Great Miami River rise before. Dayton sits where five waterways meet and had flooded before. But in March 1913, the president of the National Cash Register Company expected something far worse. Before the levee broke, he was already turning his factory into a relief station.

Three storms dumped eight to eleven inches of rain on soaked ground. On the morning of March 25, the levees on the south side gave way, and the river poured into downtown. The water rose as deep as twenty feet. The next day, a gas explosion near Fifth and Wilkinson streets set off a fire that consumed most of a city block.

Patterson's answer was to build. He put NCR's carpentry department to work on flat-bottomed boats, and hundreds came off the factory floor. Rescue teams rowed out to people stranded on rooftops and in upper stories. Patterson, sixty-eight years old, is said to have led a boat himself.

The Stewart Street factory became a city within the city. Thousands of refugees found food, beds, clothing and medical care there, even haircuts and shoe shines. Doctors and nurses staffed a hospital; the garage became a morgue. When the Dayton Daily News lost its presses, NCR printed the paper. By some accounts, the company spent nearly two-thirds of its 1913 profit on the effort.

Around 360 people died across the region. Nearly 65,000 were driven from their homes, and about 20,000 houses were destroyed.

There was an irony here. A year earlier, Patterson and other NCR executives had been convicted of antitrust violations and sentenced to a year in prison. After the flood, the public had little appetite for those convictions, and they were overturned on appeal in 1915.

By late May, Daytonians had raised more than two million dollars for flood protection. But in the first desperate days, the city's lifeboats were built in a cash register factory.

More stories in Dayton, OH: https://tourpods.com/city/dayton-oh.md
