Key facts

  • Big Bend Dam is a Missouri River dam in central South Dakota near Fort Thompson in Buffalo County.
  • Big Bend Dam is one of the six main-stem Missouri River dams built by the U.S. Army Corps of Engineers under the Pick-Sloan program.
  • The federal authority for the Big Bend project came from the Flood Control Act of 1944.
  • Big Bend Dam impounds Lake Sharpe.
  • Lake Sharpe extends upstream from Big Bend Dam to Oahe Dam near Pierre.
  • The dam includes a hydroelectric power plant.
  • The U.S. Army Corps of Engineers built Big Bend Dam and still operates it.
  • Power generated at Big Bend Dam is marketed by the Western Area Power Administration.

Read the story

Stand near Big Bend Dam and it is easy to see the scale of the thing: federal concrete, river control, a hydroelectric plant, a project built to regulate the Missouri River system. Harder to see, unless you know where to look, is the town that had to move and the reservation land that disappeared under Lake Sharpe.

Big Bend Dam sits on the Missouri River near Fort Thompson in Buffalo County, one of the six main-stem dams built by the U.S. Army Corps of Engineers under the Pick-Sloan program. Its authority came from the Flood Control Act of 1944. The Corps built it, the Corps still operates it, and the power it produces is marketed by the Western Area Power Administration. That is the official story, tidy and administrative.

The human story is rougher at the edges. Big Bend Dam impounds Lake Sharpe, which stretches upstream to Oahe Dam near Pierre. When that reservoir filled, it inundated river-bottom land on the Crow Creek Sioux Reservation and on the Lower Brule Sioux Reservation. The land taken was not spare ground or some marginal strip people happened to pass through. These Missouri River bottomlands were among the most productive and heavily used lands on the affected reservations.

What went under was the fabric of daily life: homesites, agricultural land, grazing land, timber, roads, and community infrastructure used by Crow Creek and Lower Brule residents. And around Fort Thompson, the filling of Lake Sharpe forced the relocation of much of the town from low ground to higher ground.

So the story of Big Bend Dam is not only about hydropower or river management. It is also part of the broader displacement and land loss imposed on Missouri River tribes by the Pick-Sloan dams. The losses tied to Big Bend remained a major issue in later tribal compensation and claims efforts involving the Crow Creek Sioux Tribe and the Lower Brule Sioux Tribe. That is what the water holds here: not just a reservoir, but a rearranged homeland.