# When Grand Coulee Turned Water Into War Power

How a dam built for development became crucial to wartime industry and secrecy.

- Location: Grand Coulee Dam, Grant County, WA
- Topics: history, military, notable_landmarks, technology, politics
- Web page: https://tourpods.com/stories/when-grand-coulee-turned-water-into-war-power
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- Grand Coulee Dam is a concrete dam on the Columbia River in north-central Washington.
- Grand Coulee Dam was built by the U.S. Bureau of Reclamation as the central structure of the Columbia Basin Project.
- The dam was conceived to provide both hydroelectric power and irrigation water for central Washington.
- Construction of Grand Coulee Dam began during the New Deal in the 1930s and the main dam was completed during World War II.
- President Franklin D. Roosevelt publicly backed the project and tied it to federal recovery and development efforts in the Columbia Basin.
- Rufus Woods, publisher of The Wenatchee World, was a prominent political booster of the Grand Coulee project.
- Frank A. Banks was the Bureau of Reclamation engineer most closely identified with Grand Coulee Dam and the larger Columbia Basin Project.
- Grand Coulee Dam began generating electricity before the end of World War II.

## Story

Stand beside Grand Coulee Dam and the first thing you feel is scale: concrete holding back the Columbia River in north-central Washington, water stacked into what became Franklin D. Roosevelt Lake. But the real wartime story is less about what you see than what started moving the moment that water became electricity.

Grand Coulee was conceived for two purposes at once: hydroelectric power and irrigation water for central Washington. The U.S. Bureau of Reclamation built it as the central structure of the Columbia Basin Project, and from the beginning it carried the hopes of people who wanted the Columbia Basin remade. President Franklin D. Roosevelt backed it publicly as part of federal recovery and development. Rufus Woods pushed the project in the political arena. Frank A. Banks became the engineer most closely identified with the dam and the larger basin effort. Different jobs, same wager: that this river could change the region.

Construction began during the New Deal in the 1930s, and the main dam was completed during World War II. That timing mattered. Grand Coulee began generating electricity before the war ended, and that power fed into a Pacific Northwest system under enormous pressure. It helped serve aluminum production, and wartime aluminum was no side issue; aluminum was essential for aircraft manufacture. In other words, the current running out of Grand Coulee did not stay abstract for long. It became metal, and that metal became airplanes.

The power also moved into a darker, more secretive wartime world. Electricity from Grand Coulee helped supply the regional network that served the Hanford Engineer Works during the Manhattan Project. Hanford's plutonium production required vast amounts of electricity, and Columbia River hydroelectric dams were a critical part of that supply.

So this dam's wartime role was not a footnote to its larger story. It was proof of the whole idea behind it: that water, directed by human ambition, could become national power. At Grand Coulee, the river did not just turn turbines. During the war, it helped turn the course of history.

More stories in Grant County, WA: https://tourpods.com/county/grant-county-wa.md