Through the Granite: Why Skyline Drive Tunneled Into Marys Rock

Through the Granite: Why Skyline Drive Tunneled Into Marys Rock

In 1932, builders bored 670 feet through Marys Rock rather than gash the mountainside.

📍 Sperryville, VA

HistoryLandmarksTechnology

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • Marys Rock Tunnel, 670 feet long, was bored through the solid granite of Marys Rock in 1932.
  • The tunnel was justified as avoiding an expensive cut into the existing slope and the filling of the downslope areas, which would have created a massive man-made visual feature.
  • It has been suggested that the tunnel was built as a challenge to Bureau of Public Roads and National Park Service landscape architects.
  • The tunnel was partially lined with concrete in 1958 to reduce icicles in winter and water seepage in summer, a partially successful effort.
  • The tunnel is at mile 32.2 of Skyline Drive and has a maximum clearance of 12 feet 8 inches; the park tells drivers of RVs, campers, and horse trailers to be sure they will clear it.
  • Marys Rock Tunnel is the only vehicular tunnel in Shenandoah National Park.
  • Marys Rock is a 3,514-foot mountain just south of the Thornton Gap entrance of Shenandoah National Park and is the park's eighth-highest peak.
  • The tunnel's coordinates (38.6542, -78.3125) fall in Rappahannock County, Virginia.

Read the story

Drive south from Thornton Gap and the road bends toward a wall of stone. Then the mountain swallows you. For a few heartbeats the sky is gone, and you are inside Marys Rock, the only tunnel in all of Shenandoah National Park.

William Gregg floated a ridge-top highway to L. Ferdinand Zerkel during a visit to Skyland, and in 1929 President Herbert Hoover, who kept a summer camp in these mountains, called for it to be built. Ground was broken in July 1931, paid for with drought relief money meant to put struggling Virginia farmers and apple pickers to work.

Then the builders reached Marys Rock, a 3,514-foot shoulder of granite rising just south of the gap. The usual answer was to blast a cut into the slope and dump the rubble downhill, leaving a raw scar on the mountainside. Instead, in 1932, they bored straight through the solid granite. Six hundred seventy feet of it.

The official reason was thrift: a tunnel avoided an expensive cut and all that fill. But another explanation lingers. Some say it was a dare, a challenge to the Bureau of Public Roads and to the Park Service landscape architects.

The work most likely fell to a Kentucky firm, the Ralph E. Mills Construction Company, which held the contract from Thornton Gap to Big Meadows. It was not, despite the popular story, the Civilian Conservation Corps. The CCC didn't exist until 1933, and its crews never built the roadbed. They came afterward, to grade slopes and lay stone walls.

The mountain never fully gave in. Water seeped through in summer and hung icicles in winter, so in 1958 part of the tunnel was lined with concrete. It only partly worked.

Today the clearance is twelve feet, eight inches, and the park warns RV drivers to be sure they'll fit. Everyone else rolls through the dark and back into the light, with the ridge above them still whole.