Thirty Cords an Hour, the Wood Chip Plant That Powers Burlington

Thirty Cords an Hour, the Wood Chip Plant That Powers Burlington

How a coal-to-wood experiment became Burlington's Intervale power plant and its renewable-electricity claim.

πŸ“ Burlington, VT

TechnologyNature

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free β€” no credit card required.

Download free

Key facts

  • Burlington Electric Department's coal-fired Moran Generating Station on the Burlington waterfront was named for Mayor J.E. Moran.
  • Smoke from the Moran plant's coal-fired units caused complaints from people living and working downwind.
  • In 1977 Burlington Electric Department employees tested converting one of Moran's firing units from coal to wood chips mixed with heating oil.
  • At the time of the conversion, wood chips cost $12 per ton compared with $50 for coal.
  • A second Moran coal unit was converted to wood in the summer of 1979.
  • Burlington Electric's wood-fuel studies for McNeil were driven by rising electricity demand, expected plant retirements, and the need for a local, reliable, cost-effective, non-polluting fuel.
  • In 1978 more than 70 percent of Burlington voters approved the bond that financed construction of the McNeil Generating Station.
  • On March 17, 1984, Burlington officials and the family of Joseph McNeil gathered to dedicate the McNeil Generating Station.

Read the story

Every hour at full power, a boiler in Burlington's Intervale swallows about seventy-six tons of wet wood chips, roughly thirty cords. The habit that feeds it started with a few utility workers and a coal plant.

In the 1970s, Burlington Electric ran the coal-fired Moran plant on the waterfront, named for Mayor J.E. Moran, and its smoke drew complaints from people downwind. In 1977, Burlington Electric employees tried something unusual: they converted one of Moran's coal units to burn wood chips mixed with heating oil. The math was hard to ignore. Wood chips cost $12 a ton; coal cost $50. A second unit followed in the summer of 1979.

Electricity demand was rising, older plants were headed for retirement, and planners wanted a fuel that was local, reliable and clean. In 1978, more than seven in ten Burlington voters approved the bond to build a dedicated wood-fired station. On March 17, 1984, city officials and the family of Joseph McNeil gathered to dedicate the plant that bears his name, and on June 1 it began generating. It cost $67 million, came in $13 million under budget, and was hailed as the largest wood-burning power plant in the world. Two years later, Moran went dark.

McNeil makes about 50 megawatts, roughly what Burlington needs. Its wood comes from within 60 to 70 miles, in Vermont and upstate New York, and nearly all of it is logging leftovers and cull trees. Chips are trucked to a loading yard in Swanton and put on railcars.

Around 2014, Burlington began running on 100 percent renewable electricity, drawing on wood, hydro, wind and solar. The claim has fine print. Burlington Electric sells renewable credits and buys cheaper ones to keep the label, and critics still question whether burning trees is truly carbon neutral.

But in the Intervale, the chips keep arriving, the same bet a few workers first made on a coal boiler in 1977.

There are more stories where this came from β€” near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free