The Unfinished Church Gaudí Designed Upside Down With String and Lead Shot

The Unfinished Church Gaudí Designed Upside Down With String and Lead Shot

In a textile colony outside Barcelona, Gaudí let gravity design a church. Only the crypt was built.

📍 Santa Coloma de Cervelló, Catalonia

ArchitectureHistoryScienceArtLandmarks

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • In 1890 Eusebi Güell moved his textile factory from Sants to Santa Coloma de Cervelló, where he built a workers' colony.
  • The colony included housing, a school, shops, a theatre, a cooperative, a hospital and factories.
  • Güell commissioned Antoni Gaudí to design a church for the colony in 1898, giving him complete freedom.
  • The foundation stone was laid on 4 October 1908, ten years after the commission.
  • The planned church had an oval floor plan of 25 by 63 meters and a dome 40 meters high.
  • Gaudí designed the structure with an inverted polyfunicular model, a net of cords hung with small bags of lead shot, suspended from the ceiling of a shed beside the site.
  • The model was built at 1:10 scale and stood about 4 meters tall; the weighted cords formed catenary curves.
  • Gaudí photographed the model, inverted the image, and drew over it to develop the design.

Read the story

In a shed beside a building site, strings hung from the ceiling. Bags of lead shot pulled each cord into a smooth, sagging curve. Turned upside down, this web of string was a church.

The client was Eusebi Güell. In 1890 he had moved his textile factory out of Sants to Santa Coloma de Cervelló and built a village for his workers: housing, a school, shops, a theatre, a hospital. In 1898 he asked Antoni Gaudí for the one thing missing, a church, and gave him complete freedom.

Gaudí used that freedom to let gravity do the drawing. He built a model at one-tenth scale, about four meters tall, out of cords and weights. Each loaded cord fell into a catenary curve. Gaudí photographed the model, flipped the image, and drew over it, and the hanging curves became arches and leaning columns. Ten years passed between the commission and the first stone, laid in October 1908.

The plan: an oval church sixty-three meters long under a dome forty meters high. What rose first was the lower level, a crypt tucked partly into the hillside. Its columns lean like trees in the wind, some of brick, some of basalt from Castellfollit de la Roca, the only material bought new. The window grilles were made from old loom needles from the factory. The benches came from packing wood and scrap iron.

Then, in 1914, the Güell family withdrew its funding. Work stopped and never resumed. The crypt was consecrated the following year, the foundation of a church that would never exist.

But the experiment had worked. Gaudí said he would not have dared to use these forms at the Sagrada Família without testing them here first. In 2005, UNESCO added the crypt to its list of Gaudí's works.

The string model itself is gone, known only through photographs. What it taught him is rising over Barcelona.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free