The Tunnel That Never Met, and the Hill Railway That Did

A failed bore, a one-rupee fine and a local guide behind the Kalka–Shimla Railway's longest tunnel.

📍 Barog, Himachal Pradesh

HistoryTechnologyLandmarks

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Kalka–Shimla Railway opened to passengers on November 9, 1903.
  • The line was built by the privately funded Delhi–Ambala–Kalka Railway Company under a contract signed on June 29, 1898.
  • The railway is 2 ft 6 in narrow gauge and runs about 96 kilometres from Kalka to Shimla.
  • The line climbs from Kalka at 656 metres to Shimla at 2,075 metres.
  • Herbert Septimus Harington was the railway's chief engineer.
  • The Barog tunnel, Tunnel No. 33, is 1,143.61 metres long and is the longest tunnel on the line.
  • Barog railway station lies immediately after the tunnel.
  • The abandoned first tunnel has since been closed.

Read the story

A short walk from Barog, a tunnel ends in rock. It was dug from two sides toward a meeting point that never came, and the engineer who planned it, the story goes, paid for the miss with his life.

At the turn of the twentieth century, the Delhi-Ambala-Kalka Railway set out to lay a narrow ribbon of track from the plains at Kalka, 656 meters up, to Shimla, at more than two thousand. The mountains forced the line underground again and again. It runs through more than a hundred tunnels.

According to local tradition, a British engineer remembered as Colonel Barog bored his tunnel from both ends at once, and the two halves did not line up. The authorities, the story says, fined him a single rupee for wasting government money. Humiliated, he went out walking with his dog and shot himself. He was buried in front of his unfinished tunnel, and the settlement that grew up nearby still carries his name.

The job passed to the chief engineer, H. S. Harington, who was given charge of a new tunnel. Here the legend adds a second man: Bhalku, a holy man from Jhaja, near Chail, remembered for a natural gift for engineering. Tradition holds that he guided the new alignment, and that the Viceroy rewarded him with a medal and a turban his family still keeps.

The new bore, Tunnel Number 33, stretches more than eleven hundred meters, the longest on the line. The railway opened to passengers on November 9, 1903, and in 2008 UNESCO made it part of the Mountain Railways of India World Heritage Site.

Today the train crawls through Barog's tunnel in about two and a half minutes. The first tunnel is sealed shut. And in 2022, writers rode the line on a literary journey named for Bhalku, the local man who, if the story is true, found the path the colonel could not.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free