The Tourist Who Dug a Railway Under Galata Hill

The Tourist Who Dug a Railway Under Galata Hill

A French visitor's 1875 underground funicular, the world's second-oldest subway, still climbing from Karaköy to Beyoğlu.

📍 Istanbul, Istanbul Province

HistoryTechnologyLandmarks

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Tünel is an underground funicular about 573 meters long with two stations, connecting Karaköy (the lower station) and Beyoğlu (the upper station).
  • The Tünel began carrying passengers on January 17, 1875, making it the second-oldest underground urban railway in the world after the London Underground, which opened in 1863.
  • In the second half of the 19th century, embassies, hotels and markets sat at the top of the hill in Pera, while the stock exchange, banks and ports were at the bottom in Galata.
  • In 1867 the French engineer Eugène-Henri Gavand visited Constantinople as a tourist and was struck by the number of people struggling up and down Yüksek Kaldırım.
  • Sultan Abdülaziz granted Gavand the concession to build the railway on June 10, 1869.
  • The Franco-Prussian War made it impossible to form a French company, so Gavand went to Britain and formed the Metropolitan Railway of Constantinople.
  • Construction began in 1871 and was delayed by conflicts between landowners and the company.
  • Construction of the tunnel was completed in December 1874.

Read the story

In 1867, a French engineer named Eugène-Henri Gavand came to Constantinople as a tourist. What caught his eye wasn't a palace or a mosque. It was a hill, and the crowds of people struggling up and down it.

The hill rose right where you're standing. Down here in Galata sat the stock exchange, the banks and the ports. Up top in Pera were the embassies, the hotels and the markets. Between them ran a street called Yüksek Kaldırım, with grades as steep as twenty-four percent. Every day, tens of thousands of people climbed it on foot.

Gavand saw a fix: dig a railway straight through the hill. Sultan Abdülaziz granted him the concession on June 10, 1869. Then the Franco-Prussian War made it impossible to raise a French company, so Gavand crossed to Britain and founded the Metropolitan Railway of Constantinople instead. Digging began in 1871 and dragged on amid fights with landowners. The tunnel was finally finished in December 1874.

On January 17, 1875, it began carrying passengers, making it the second-oldest underground railway in the world, after only London's. Two wooden trains ran on steam power, lit by gas lamps. One car carried people, with men and women in separate sections; the other hauled goods, animals and carts. By most accounts, Gavand himself was absent from the opening ceremony.

That August, the cable on an uphill train snapped, and the car rolled backward toward this very station. The driver slammed on the emergency brakes and stopped it about forty meters short.

The line was nationalized in 1939, then rebuilt and electrified, reopening in 1971 with steel cars on rubber tires. Today each car carries 170 passengers.

The ride takes about ninety seconds. It climbs roughly sixty-one meters, up the same hill that once wore out a city of walkers, and that a visiting tourist decided to go through instead of over.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free