The Slate Railway Volunteers Rebuilt Around a Reservoir, One Spiral at a Time

The Slate Railway Volunteers Rebuilt Around a Reservoir, One Spiral at a Time

How the Ffestiniog Railway went from gravity slate line to ruin to a volunteer-built return to Blaenau.

📍 Blaenau Ffestiniog, Wales

LandmarksHistoryTechnology

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Festiniog Railway Act received royal assent on 23 May 1832; capital was mostly raised in Dublin by Henry Archer, the company's first secretary and managing director.
  • The railway opened on 20 April 1836 and runs about 13½ miles between Porthmadog and Blaenau Ffestiniog on a gauge of 1 ft 11½ in.
  • Loaded slate wagons ran downhill by gravity on a gentle, steady grade; horses hauled the empty wagons back up, and rode down in "dandy" wagons.
  • Charles Easton Spooner served the railway as Manager and Clerk for 30 years.
  • The first steam locomotive, Mountaineer, arrived at Porthmadog on 18 July 1863, and the first official steam train ran on 23 October 1863.
  • Passenger services were officially introduced in 1865, and the railway is described as the first narrow-gauge railway in Britain to carry passengers.
  • Robert Fairlie's company built the double-bogie locomotive Little Wonder for the railway in 1869, and in February 1870 Fairlie ran demonstrations on the line for delegations from many parts of the world.
  • A Fairlie locomotive rides on two swivelling powered bogies with all wheels driven.

Read the story

For its first quarter century, the Ffestiniog Railway barely needed engines. Slate wagons rolled downhill from the quarries above Blaenau Ffestiniog to the harbour at Porthmadog on gravity alone, and the horses that hauled the empties back up rode down in little wagons of their own.

The line opened in 1836, running about thirteen and a half miles on rails less than two feet apart. In 1863 steam arrived, and in 1865 passengers, making it the first narrow-gauge railway in Britain to carry them. Then came a strange-looking machine. In 1869 Robert Fairlie's company built Little Wonder, a double engine riding on two swivelling, powered bogies, and in February 1870 Fairlie ran demonstrations here for delegations from around the world.

But slate faded. Ordinary passenger trains stopped in 1939, and the last slate traffic ended in 1946. The line lay derelict until 1954, when an enthusiast named Alan Pegler, with three thousand pounds lent by his father, took control. Restoration began at the works at Boston Lodge, and trains crept back up the valley, station by station, reaching Dduallt in 1968.

There, the way ahead lay under water. A pumped storage power scheme had built a reservoir, Llyn Ystradau, drowning about a mile of the old line. So the volunteers built a new one. From 1965 to 1978 they carved a diversion roughly two and a half miles long. At Dduallt, the track loops in a full spiral, the only one on a public railway in Britain, climbing over itself on a bridge the volunteers built entirely themselves. Three Cornish tin mining engineers dug a new tunnel.

On 25 May 1982, trains steamed into Blaenau Ffestiniog again, to a station shared with the main line. The railway that once ran downhill on gravity had been pushed back uphill by hand.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free