Read the story
Stand on the Central Harbourfront, with Kowloon glittering across the water, and consider this: the ground under your shoes was harbour too.
When the British cut their first road here between 1841 and 1843 and named it Queen's Road after Queen Victoria, it traced the island's original shoreline. Then Hong Kong started building outward. After an 1851 fire, the rubble went into the harbour as new land. The Praya Reclamation, carried out under Paul Chater and James Johnstone Keswick, added roughly sixty acres to Central's waterfront. And in the 1990s came a plan to fill the shore from Sheung Wan to Causeway Bay. One phase alone pushed Central's coastline out by as much as 350 metres.
Winston Chu, a solicitor, had sat on the Town Planning Board for eight years. With legislator Christine Loh, he built the Society for Protection of the Harbour. Loh carried their bill into the Legislative Council in November 1996, and it passed on 27 June 1997, days before the handover. Its heart was one sentence: there shall be a presumption against reclamation in the harbour.
Then the society went to court. In July 2003, Madam Justice Chu of the High Court struck down the Town Planning Board's plan for Wan Chai and set three tests: a compelling, present need; no viable alternative; minimum harm. Early the next year, Hong Kong's highest court confirmed the bar. Any new filling now had to prove an overriding public need, and Wan Chai's plans went back for review.
It was not a clean win. In October 2003, despite more than a thousand marchers, the courts let the last Central phase proceed, about 230,000 square metres of harbour.
In 2025 the law was loosened, and the society disbanded. But for more than a century and a half, this water was treated as land in waiting. One sentence made it something to defend.