The Roofless Hall and the Glass Spike Driven Through It

The Roofless Hall and the Glass Spike Driven Through It

Nuremberg's unfinished Nazi Congress Hall and the architect who cut a glass gallery through its north wing.

📍 Nuremberg, Bavaria

ArchitectureHistory

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Congress Hall was planned by architects Ludwig Ruff and his son Franz Ruff; Ludwig Ruff died in August 1934 and Franz Ruff took over the project.
  • Hitler approved the design in 1934, and the foundation stone was laid on 11 September 1935 during the Nazi Party rally.
  • The hall was planned to seat 50,000 people for Nazi Party congresses.
  • The U-shaped building was modeled on ancient theaters; Nazi propaganda compared it to the Colosseum, a comparison that fits only parts of the outer facade.
  • Construction used roughly 42 million bricks plus concrete and granite; the facade is clinker brick faced with granite panels.
  • The hall reached 39 meters in height of a planned 70 meters and has a diameter of about 250 meters.
  • Work slowed after the war began and stopped in 1943 as labor and materials were diverted to the war effort; the building was never finished and never roofed.
  • After the war the Americans first used the building as a food depot, and it hosted the 1949 German building exhibition.

Read the story

Look up from inside Nuremberg's Congress Hall. Where a roof was meant to close over 50,000 Nazi Party delegates, there is only sky.

The first plans were Ludwig Ruff's. When he died in August 1934, his son Franz took over, and Hitler approved the plans that year. The foundation stone went down on 11 September 1935, during the party rally. The horseshoe-shaped hall was modeled on ancient theaters, and propaganda likened it to the Colosseum. Some 42 million bricks went into it, faced with granite.

It climbed to 39 meters of a planned 70. Once the war began, work slowed, and in 1943 it stopped as labor and materials went elsewhere. The hall was never finished and never roofed.

After 1945 the shell took whatever use came along. The Americans stored food in it. From 1972 to 2006, a mail-order company kept its main warehouse in the ring. In 1987 the city council blocked a plan to make it a shopping centre.

In 1998 Günther Domenig, a professor from Graz, won the competition to put a documentation centre in the north wing. His aim was to break the building's rigid axis. A glass-and-steel gallery, 130 meters long, cuts diagonally through the wing and its vast, unfinished halls. Walking back through it, visitors see the Congress Hall from unfamiliar angles, and the building itself becomes the exhibit. The centre opened on 4 November 2001, and in 2019 drew more than 311,000 visitors.

Expansion began in 2020, and with a new permanent exhibition the whole building is open again. In the courtyard, an interim stage for the State Theatre's opera has been under construction since November 2024, due by the end of 2028. Historians have objected that it alters the evidence.

The hall its builders planned was never completed. Its one finished statement belongs to Domenig: a straight line of glass, cut at an angle through stone.

There are more stories where this came from — near you.