# The Railway That Set Out for the Summit of Mont Blanc

Saint-Gervais's 1909 rack railway aimed for Mont Blanc's summit, then stalled at the Eagle's Nest.

- Location: Nid d'Aigle station (Tramway du Mont-Blanc terminus), Saint-Gervais-les-Bains, Auvergne-Rhône-Alpes, France
- Topics: technology, history
- Web page: https://tourpods.com/stories/the-railway-that-set-out-for-the-summit-of-mont-blanc
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- Henri Duportal, a retired chief engineer of the Ponts et Chaussées, led the railway project chosen in 1902–1903.
- The Haute-Savoie general council chose Duportal's project on 9 July 1904, and the definitive concession was granted on 3 August 1904.
- Duportal's project planned a tunnel up to the Aiguille du Goûter at 3,817 meters, and then Mont Blanc itself after further studies.
- A rival Fabre–Vallot project, not chosen, would have run about 10 kilometers of its route in tunnel.
- The first section, from Le Fayet to the Col de Voza, was inaugurated on 25 July 1909.
- The company suffered a cash crisis in 1908–1909, Duportal resigned over the poor finances, and a provisional administrator was appointed in 1912.
- Service was extended to Mont Lachat in June 1911.
- The Nid d'Aigle station, at 2,372 meters, opened on 1 August 1913 as a provisional terminus.

## Story

The names on the first steam engines tell you what this railway believed it was. Jacques Balmat. Horace Bénédict de Saussure. Mademoiselle d'Angeville. Pierre Janssen. Heroes of Mont Blanc, every one, hauling trains that were supposed to end on top of the mountain.

The man behind the plan was Henri Duportal, a retired chief engineer from France's corps of bridges and roads. In 1904 the Haute-Savoie council chose his project over rivals, including one that would have bored about ten kilometers of tunnel through the massif. Duportal's line would climb from Le Fayet, tunnel up to the Aiguille du Goûter, and then, after further studies, reach Mont Blanc itself.

The first stretch, up to the Col de Voza, opened in July 1909. The money was already running out. A cash crisis struck in 1908 and 1909, and Duportal resigned. By 1912 a provisional administrator was running the company. Still, the rails crept upward, to Mont Lachat in 1911, then to a station called the Nid d'Aigle, the Eagle's Nest, at 2,372 meters, in August 1913. It was meant to be temporary.

Then, on August 2, 1914, France mobilized for war. Work toward the summit stopped, and it never resumed. The provisional terminus became the end of the line for more than a century.

Steam gave way to electricity in 1957, cutting the trip time in half, and three new railcars arrived named Marie, Jeanne and Anne. In June 2026, a 280-meter extension finally reached a new station by the refuge at 2,412 meters, and the line's construction was officially declared finished.

It is still the highest railway in France, gripping its rack up grades of twenty-four percent. Climbers bound for Mont Blanc ride it to the end and walk from there. The summit those first engines were named for is still up ahead, out of the train's reach.

More stories in Saint-Gervais-les-Bains, Auvergne-Rhône-Alpes: https://tourpods.com/country/fr/city/saint-gervais-les-bains-fr.md
