The Narrow-Gauge Line Through a Canyon Called Unsuitable for Railroads

The Narrow-Gauge Line Through a Canyon Called Unsuitable for Railroads

How the Denver and Rio Grande forced a railroad through the Black Canyon, and what remains at Cimarron.

📍 Montrose, CO

HistoryTechnologyLandmarks

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • In 1853 Captain John W. Gunnison's survey party passed through the area while seeking a transcontinental railroad route and judged the terrain "totally unsuitable for a railroad."
  • William Jackson Palmer chose a three-foot narrow gauge for the Denver and Rio Grande because steep passes and narrow canyons made standard gauge too expensive and slow.
  • The Denver and Rio Grande was built toward Gunnison to tap wealth from nearby gold and silver mines, and reached Gunnison in August 1881.
  • At the junction of the Lake Fork and the Gunnison River, railroad officials chose the river route through the Black Canyon over the mesas, judging it cheaper and more likely to stay free of snow.
  • Hundreds of mostly Italian and Irish immigrant workers laid the track.
  • About 15 miles of line from Sapinero to Cimarron were built during the winter of 1881-82.
  • Nitroglycerine accidentally detonated near Sapinero during construction, killing a foreman named Sweeny; an African-American worker on the grading crew died within an hour of his injuries.
  • The first train crossed the canyon in August 1882, and the editor of the Gunnison Review-Press called it "the largest and most rugged canon in the world traversed by the iron horse."

Read the story

In 1853, Captain John W. Gunnison surveyed this country and pronounced it totally unsuitable for a railroad. Within thirty years, a train was running through the bottom of its deepest canyon.

The Denver and Rio Grande was chasing gold and silver, and William Jackson Palmer had built it on narrow track, three feet between the rails, cheap enough to bend through mountains. West of Gunnison, officials could climb over the mesas or follow the river into the Black Canyon. They chose the canyon, betting it was cheaper and freer of snow.

In the winter of 1881 and 1882, hundreds of mostly Irish and Italian immigrants carved about fifteen miles from Sapinero down to Cimarron. The work was deadly. Near Sapinero, nitroglycerine went off by accident, killing a foreman named Sweeny. An African-American worker on the grading crew died within the hour.

In August 1882, the first train came through. Rudyard Kipling later wrote of a river that roared and howled ten feet below the track. The railroad sold the ride as the Scenic Line of the World and put the canyon's seven-hundred-foot granite spire, Curecanti Needle, on its emblem.

West of Cimarron, Cerro Summit was too steep for a train to climb alone, so helper engines waited in town. Engine 278, a Baldwin helper locomotive built in 1882, worked this line for more than seventy years.

The canyon outlasted the railroad. In 1949 the line was abandoned and the rails torn up; most of the roadbed now lies under Morrow Point Reservoir. But 278 was given to Montrose, and in 1974 it was rolled onto the steel truss bridge over the Cimarron River, the last railroad bridge left from the Black Canyon line.

The engine has left for repairs before, and in the fall of 2025 it was moved off again. The bridge, standing since 1895, is still holding its place in the canyon nobody thought a train could cross.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free