# The Mountain on Springs Built to Outlast the End of the World

How crews blasted a command center into Cheyenne Mountain and set its buildings on giant springs.

- Location: Cheyenne Mountain Space Force Station, Colorado Springs, CO
- Topics: military, notable_landmarks
- Web page: https://tourpods.com/stories/the-mountain-on-springs-built-to-outlast-the-end-of-the-world
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- NORAD's operations center was moved from an above-ground facility, vulnerable to missile or bomber attack, into the granite of Cheyenne Mountain during the Cold War.
- The complex was designed to shield command and control operations from Soviet nuclear weapons.
- Excavation began May 18, 1961, by Utah Construction & Mining Company under U.S. Army Corps of Engineers supervision.
- The June 16, 1961 groundbreaking was marked by symbolic dynamite charges set off simultaneously by General Laurence S. Kuter of NORAD and General Lee of Air Defense Command.
- The Corps of Engineers hired Clifton W. Livingston of the Colorado School of Mines to advise on controlled blasting for smooth tunnel walls.
- On December 20, 1961, with excavation 53 percent complete, about 200 workers walked off the job after a worker was fired for disobeying safety rules; they returned three days later and the fired worker was reinstated.
- Utah Construction project manager Cecil Welton called the December 1961 walkout a wildcat strike.
- A geological fault in the ceiling of one tunnel intersection had to be reinforced with a massive concrete dome costing 2.7 million dollars.

## Story

On June 16, 1961, two generals set off charges of dynamite at the same moment, and the face of Cheyenne Mountain shook. Laurence Kuter of NORAD and General Lee of Air Defense Command weren't clearing a road. They were opening a hole meant to hide a command center from the end of the world.

NORAD's operations center sat above ground, exposed to any bomber or missile the Soviets might send. The answer was to go inside the granite. The Army Corps of Engineers ran the job, and Utah Construction and Mining did the drilling and blasting. For smooth tunnel walls, the Corps brought in Clifton Livingston, a blasting adviser from the Colorado School of Mines.

Crews pinned the rock with 110,000 rock bolts, some thirty-two feet long. In December 1961, about 200 workers walked off the job after a man was fired for breaking safety rules. Three days later the crews were back, and so was the fired worker. Then engineers found a geological fault in the ceiling of one intersection, and the fix was a massive concrete dome costing 2.7 million dollars.

By May 1, 1964, the digging was done. Nearly 700,000 tons of granite had come out of the mountain. Into the hollow went steel-faced buildings, three stories tall, that rest on giant steel springs. Each spring weighs about 1,500 pounds, and together they let a shock wave from an earthquake or a nuclear blast roll through while the buildings move only about an inch. Doors weighing 25 tons each guarded the way in.

The complex reached full operation on February 6, 1967, at a cost of 142.4 million dollars, with roughly two thousand feet of rock overhead.

Through the Cold War, those doors were often swung shut. The last time they closed was September 11, 2001. Today they stand open around the clock, inside a mountain built to ride out the worst day anyone could imagine.