Read the story
Ride the tram up Sabino Canyon and count the bridges: nine low stone crossings over Sabino Creek, every one built to lead to a lake that never came to exist.
The dream was older than the road. In 1901, a University of Arizona professor named Sherman Woodward proposed damming the canyon to give Tucson water and electric power. That plan stalled, reportedly because the creek didn't carry enough water to keep a reservoir full.
Then came the crash of 1929, and the Tucson Chamber of Commerce went looking for salvation in tourism. In 1933 it began lobbying for a federal dam. The centerpiece was a wall 250 feet high, about four miles up the canyon, holding back a lake for boating and fishing, ringed with lakeside cabins. The road in would cross the creek nine times, with a small check dam at each crossing making a pond and picnic spot.
Relief workers made it real. Paid with federal emergency funds, they broke ground in October 1934. The Works Progress Administration took over the next year, and by January 1937 the road had pushed to within a mile of the dam site.
That month, the Army Corps of Engineers gave its answer. It recommended the dam, but only if local interests put up $500,000. Tucson never raised it, and the big lake died on paper.
Fred Winn, supervisor of the Coronado National Forest, salvaged a smaller version: a modest dam downstream that would cost the city and county nothing. Work began in June 1937, and the following April the little lake was dedicated. Then the desert did what it does, and Winn's lake slowly filled with silt.
Today more than a million people a year ride up that Depression road, closed to private cars since 1981. They cross the nine bridges, listen to the creek running free, and never see the lake that was supposed to be waiting at the end.