# The Engineer Who Taught a Train to Zigzag Up Hakone

How a Swiss study trip shaped Japan's steepest adhesion railway, from 1919 to the 2019 typhoon.

- Location: Gōra Station, Hakone, Kanagawa, Japan
- Topics: technology, history, notable_landmarks
- Web page: https://tourpods.com/stories/the-engineer-who-taught-a-train-to-zigzag-up-hakone
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- The mountain section of the Hakone Tozan Line between Hakone-Yumoto and Gōra opened on June 1, 1919.
- The line's steepest grade is 80 per mille (8 percent), the steepest of any adhesion railway in Japan.
- The line climbs by three switchbacks, at Deyama signal stop, Ōhiradai Station and Kami-Ōhiradai signal stop; Ōhiradai is the only one where passengers can board.
- The 1911 license for the extension from Yumoto to Gōra, granted to the Odawara Electric Railway, carried the condition that the natural scenery be spoiled as little as possible.
- In July 1912 chief engineer Handa Mitsugu was sent to Europe and returned after about half a year of study.
- Handa found Switzerland's Bernina Railway, where a 70 per mille grade runs for about 20 kilometers, closely matched the Hakone plan and served as its model.
- Because an adhesion railway was found unable to climb a 125 per mille grade, the line was built with three switchbacks and a maximum grade of 80 per mille.
- The outbreak of the First World War in 1914 cut off imports of planned materials and affected construction.

## Story

In the summer of 1912, a Japanese railway engineer named Handa Mitsugu set off for Europe with one question: how do you drive an ordinary train up a mountain?

His company, the Odawara Electric Railway, held a license to push its line from the hot-spring town of Hakone-Yumoto up to Gōra, with one striking condition: spoil the natural scenery as little as possible.

Handa spent about half a year abroad and found his model in Switzerland, on the Bernina Railway, where trains climbed a steady seventy per mille for some twenty kilometers. A train relying on plain adhesion could not manage the steepest grades on the drawing board, so the Hakone line would top out at eighty per mille, rising eight meters for every hundred. Where the mountain was steeper than that, the train would zigzag: three switchbacks, where the train reverses and climbs on the other way.

Building it took more than seven years. The First World War cut off imported materials. Surveyors found that tunnels would damage the hot-spring veins, so the route moved onto the mountainside. Over the Hayakawa gorge, crews raised a secondhand truss from a Tōkaidō Main Line bridge, forty-three meters above the riverbed. The line opened on June 1, 1919, still the steepest adhesion railway in Japan.

The mountain kept testing it. On October 12, 2019, Typhoon Hagibis dropped 922.5 millimeters of rain on Hakone in a single day, the most ever recorded in Japan. Landslides tore at the track, and the mountain section fell silent for about nine months, reopening on July 23, 2020.

The Swiss debt was never forgotten: since 1979, the line has been a sister railway to the Rhaetian Railway, which runs the Bernina line today. And from mid-June, more than ten thousand hydrangeas bloom beside the track, as the little trains zigzag patiently uphill, the way Handa planned.

More stories in Hakone, Kanagawa: https://tourpods.com/country/jp/city/hakone-jp.md