In the summer of 1912, a Japanese railway engineer named Handa Mitsugu set off for Europe with one question: how do you drive an ordinary train up a mountain?
His company, the Odawara Electric Railway, held a license to push its line from the hot-spring town of Hakone-Yumoto up to Gōra, with one striking condition: spoil the natural scenery as little as possible.
Handa spent about half a year abroad and found his model in Switzerland, on the Bernina Railway, where trains climbed a steady seventy per mille for some twenty kilometers. A train relying on plain adhesion could not manage the steepest grades on the drawing board, so the Hakone line would top out at eighty per mille, rising eight meters for every hundred. Where the mountain was steeper than that, the train would zigzag: three switchbacks, where the train reverses and climbs on the other way.
Building it took more than seven years. The First World War cut off imported materials. Surveyors found that tunnels would damage the hot-spring veins, so the route moved onto the mountainside. Over the Hayakawa gorge, crews raised a secondhand truss from a Tōkaidō Main Line bridge, forty-three meters above the riverbed. The line opened on June 1, 1919, still the steepest adhesion railway in Japan.
The mountain kept testing it. On October 12, 2019, Typhoon Hagibis dropped 922.5 millimeters of rain on Hakone in a single day, the most ever recorded in Japan. Landslides tore at the track, and the mountain section fell silent for about nine months, reopening on July 23, 2020.
The Swiss debt was never forgotten: since 1979, the line has been a sister railway to the Rhaetian Railway, which runs the Bernina line today. And from mid-June, more than ten thousand hydrangeas bloom beside the track, as the little trains zigzag patiently uphill, the way Handa planned.