- President Franklin D. Roosevelt created the Civilian Conservation Corps on March 31, 1933, to put unemployed young men between the ages of 18 and 25 to work in parks, forests, and rangelands.
- CCC enrollees were paid $30 a month plus room and board, and $22.50 to $25 of that pay was sent home to their families.
- A CCC camp was organized and established at Wind Cave National Park in 1934; the enrollees built the camp themselves between August 2 and October 6, 1934.
- The Wind Cave camp had an education department offering academic and vocational classes; its music classes produced the Wind Cave Quartet, and its baseball team won the South Dakota CCC Championship in 1935 and 1936.
- The concrete lining of the elevator shaft was completed in April 1935, and the Otis Elevator Company completed installation of the elevator in October 1935.
- The 1935 Otis elevator traveled 700 feet per minute and carried 12 people.
- The elevator's first breakdown occurred on December 15, 1935, blamed on a defective resistance coil and moisture precipitating on switches and controls as warm, moist air rising through the shaft from the cave cooled.
- In the cave, CCC crews installed concrete stairs with iron railings to replace wooden ones, including replacing the old 75-foot flight of wooden stairs just inside the cave entrance, and built a walk-in entrance near the Natural Entrance for tours.

## Story

Two months after it was finished, the elevator at Wind Cave broke down. On December 15, 1935, warm, moist air rising up the shaft from the cave met the winter cold, and water condensed on the switches and controls. The cave, it turned out, had opinions about the machine.

The machine was the work of the Depression's jobless young men. In 1933 President Franklin D. Roosevelt created the Civilian Conservation Corps, putting men between eighteen and twenty-five to work in parks and forests for thirty dollars a month, most of it sent home to their families. In 1934, a camp was established at Wind Cave, and the enrollees started by building it themselves.

Then they started digging. Work on the elevator shaft began on August 20, 1934, reaching roughly two hundred feet down through rock. By April 1935 its concrete lining was done, and that October the Otis Elevator Company finished installing a car that carried twelve people at seven hundred feet a minute. Underground, the crews tore out old wooden stairs and poured concrete steps with iron railings.

In December 1937 they began the elevator building itself. It took ten months and 4,900 man-days of labor, paid at two dollars a day. Around it, the same men sloped road banks, fenced the park boundary, planted thousands of trees, and won the state CCC baseball championship twice.

Much of what they built still stands, now on the National Register of Historic Places. The machinery has had a harder time aging. Repairs halted tours in 2023. In May 2024, with parts from the 1930s still in service, the park shut the cave for a complete rebuild. Tours resumed January 28, 2025. Three months later, a transformer failed and stopped them again.

About 130,000 people a year still ride down the shaft those young men dug. And the cave still breathes on it.