The Days the Iguazú Took Back Its Catwalks

The Days the Iguazú Took Back Its Catwalks

Floods in 2014 and 2023 tore away Iguazú's walkways; droughts have nearly emptied the falls.

📍 Puerto Iguazú, Misiones

NatureScienceHistory

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Iguazú River's usual flow over the falls is about 1,500 cubic meters per second.
  • The official maximum recorded flow at the falls was 46,300 cubic meters per second on June 9, 2014; the gauge registered a further rise of more than 30 cm after that, and the system stopped calculating instantaneous flow, so the true peak is estimated at 50,000 to 60,000 cubic meters per second.
  • The June 9, 2014 peak (about 46,300 cubic meters per second) was roughly thirty times the usual flow of about 1,500.
  • The 2014 flood was attributed to intense rain in the upper basin of the Iguazú River in Brazil, and it surpassed the 1983 flood.
  • The largest previously recorded flood was in July 1983, at 35,600 cubic meters per second.
  • The June 2014 flood carried away most of the walkway sections to the Garganta del Diablo, and recovery took six months.
  • A flood on October 29, 2005 (about 19,000 cubic meters per second) swept away 33 sections of metal walkway, and a June 2013 flood took 28 sections.
  • On October 29, 2023, the Argentine park closed to the public as a flood began that pushed the river's flow to 24,000 cubic meters per second.

Read the story

On an ordinary day, the Iguazú River pours about 1,500 cubic meters of water a second over these cliffs. On June 9, 2014, it poured about thirty times that.

The official gauge logged 46,300 cubic meters a second, the biggest flood on record. Then the water kept rising past that mark until the measuring system stopped calculating. The true peak may have reached 50,000 or more. Heavy rain in the river's Brazilian headwaters had arrived all at once, smashing the old record set in 1983. Most of the steel walkway to the Garganta del Diablo, the Devil's Throat, was gone. Rebuilding it took six months.

The crews who maintain these catwalks know the routine. A flood in 2005 took 33 sections. Another in 2013 took 28. Each time, they bolt the path back together.

On October 29, 2023, the park closed as the river climbed again, this time to about 24,000 cubic meters a second. It ripped out 79 sections of the 1,100-meter walkway, carried off 400 meters of train track, and rose nearly to the roofs of the snack bars. Carol da Rosa, a manager with the company that runs the park's services, saw what was left. "The force of the river is extraordinary," she said. "We found twisted rails and walkways that could never be used again." The walkway stayed closed almost nine months, reopening in July 2024 after an investment the company's chief, Roberto Enríquez, put at about a billion pesos.

And the river can fail in the other direction. In the summer of 2006, drought shrank the falls to about 300 cubic meters a second, until early December. In 1978 the flow fell to roughly 90.

So the boards beneath you on this Lower Circuit are temporary by design. Six dams line the river upstream, but the Iguazú still decides, flood by flood and drought by drought, how much of itself to show you.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free