Key facts

  • Hoover Dam spans the Colorado River in Black Canyon on the Nevada-Arizona border, southeast of Las Vegas.
  • The dam was built by the U.S. Bureau of Reclamation as the central feature of the Boulder Canyon Project.
  • The Boulder Canyon Project Act was signed into law in 1928, authorizing the dam and related works on the lower Colorado River.
  • Herbert Hoover played a major role in the interstate negotiations over Colorado River water that preceded the dam’s construction.
  • John L. Savage, a Bureau of Reclamation engineer, was a principal designer of Hoover Dam and its hydroelectric system.
  • Gordon B. Kaufmann was the dam’s consulting architect and designed its streamlined Art Deco architectural treatment.
  • The construction contract was awarded to Six Companies, Inc., a consortium of western contractors.
  • Construction began in 1931 during the Great Depression.

Read the story

Before Hoover Dam was a postcard, it was a wager made in rock, heat, and moving water. In Black Canyon, southeast of Las Vegas, people set out to do something that sounds almost unreasonable even now: push the Colorado River aside, build in its bed, and turn that force into light.

The legal door opened in 1928, when the Boulder Canyon Project Act authorized a dam and related works on the lower Colorado River. Herbert Hoover had already played a major role in the interstate negotiations over that water. Then the planners and builders took over. John L. Savage, a Bureau of Reclamation engineer, became a principal designer of both the dam and its hydroelectric system. Gordon B. Kaufmann gave the project its streamlined Art Deco look, because even a machine this muscular, apparently, was allowed to dress well.

Construction began in 1931, during the Great Depression, after the contract went to Six Companies, Inc. The federal government created Boulder City to house many of the workers and administrators, and thousands of workers poured into southern Nevada. To make room for the dam itself, four diversion tunnels were driven through the canyon walls, rerouting the river so a concrete arch-gravity dam could rise where the water had been.

And the point of all that labor was not only to hold back water. The powerhouse was built with multiple large turbine-generator units, designed to turn falling Colorado River water into electricity for Nevada, Arizona, and California. The first commercial electricity came in the mid-1930s, before the entire project was fully finished. The dam was completed ahead of schedule, and President Franklin D. Roosevelt dedicated it in 1935.

That electricity became a major source of power for southern Nevada and the wider Southwest. And around the mid-20th century, that steady current helped Las Vegas grow from a railroad town into a larger urban center. So the real story of Hoover Dam is this: in the canyon, people built a wall of concrete — and out on the desert, they built a future.