The Coal Line That Outlasted the Canal Through the Cuyahoga Valley

The Coal Line That Outlasted the Canal Through the Cuyahoga Valley

Akron lawyer David L. King's coal railroad, the fading canal it passed, and today's scenic train.

📍 Peninsula, OH

HistoryTechnology

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Valley Railway Company was incorporated in Ohio on August 21, 1871; its incorporators included Henry Chisholm, James Farmer, Samuel Augustus Fuller, David L. King, Nathan P. Payne, and Warrick B. Price.
  • David L. King, an Akron attorney, was the chief organizer of the Valley Railway.
  • The goal of the Valley Railway was to link the industrial centers of Cleveland and Akron with the coal fields of Stark and Tuscarawas counties.
  • Because the line was meant to carry very heavy coal loads, its directors required a downhill grade toward the two cities and very wide, gentle curves.
  • Construction was suspended on May 14, 1874, after the Panic of 1873, and by fall 1874 the company's debts reached $150,000.
  • David L. King became president of the railway on September 25, 1874, after the board agreed to personally cover the company's liabilities.
  • The first train, carrying businessmen, civic leaders, clergy, industrialists, and politicians, ran between Cleveland and Canton on January 28, 1880; regular freight and passenger service began February 2, 1880.
  • Peninsula was one of the Valley Railway's original depots, and a spur served the Lawson Waterman quarry at Peninsula.

Read the story

In the winter of 1880, a train rolled through the Cuyahoga Valley carrying businessmen, clergy, industrialists and politicians. It was the first run of the Valley Railway, and for the man who had willed it into existence, it had been a long ride.

David L. King was an Akron attorney with a stubborn idea. Akron and Cleveland were growing industrial centers, and to the south, in Stark and Tuscarawas counties, lay coal. King wanted rails between them. The line's engineering was built around that black cargo: a steady downhill grade toward the cities and wide, gentle curves, so heavy coal trains could roll without strain.

Then the Panic of 1873 hit. By 1874, construction had stopped and the company owed a hundred and fifty thousand dollars. That fall, King took over as president, after the board agreed to cover the debts personally. Bonds sold to bankers in Cleveland and New York eventually got crews working again.

Since the Civil War, it had been clear that railroads would take the Ohio and Erie Canal's business. Peninsula had been a busy canal port, with quarries, boatyards, mills, five hotels and fourteen taverns. The Valley Railway put a depot right here, and within a decade freight paid three quarters of its bills, much of it coal. Along part of its route, the railroad even laid track on the abandoned canal bed, filling the old ditch with ballast.

The canal never recovered; the flood of 1913 finished it. The railroad passed to the Baltimore and Ohio, and its last passenger train ran in 1962.

But the rails stayed. Excursion trains returned in 1975, and in 1987 the National Park Service bought about twenty-six miles of the line. Today it's the Cuyahoga Valley Scenic Railroad, and at the Peninsula Depot, cyclists load their bikes into a baggage car. The tracks built to haul coal past a dying canal now carry people who came to see both.

There are more stories where this came from — near you.

TourPods narrates the hidden history, true crime, and local lore of wherever you're standing. Your first 20 stories are free.

Download TourPods free