In 1884, the first construction train to start down a brand-new grade west of the Kicking Horse Pass could not stop. It ran away down the mountain, workmen leaping for the rocks, and three men died.
That grade was the Big Hill, and it was steep on purpose. The Canadian Pacific Railway was racing to finish, and the proper route meant a long tunnel through Mount Stephen. By most accounts, railway boss William Van Horne decided an open line mattered more than a perfect one. So the track went almost straight down the mountain at four and a half percent, twice what railways normally allowed, one of the steepest main lines anywhere.
Living with it took nerve. The railway built three safety switches on the way down, each set to throw a train onto a short spur that climbed sharply uphill. Switchmen left them there until sure the oncoming train was under control. Passenger trains crept at eight miles an hour, freights at six. At the bottom, a work camp called Third Siding grew up to house the extra locomotives needed to shove trains back up. The railway renamed it Field. Still, disasters came with dismaying frequency.
The temporary line lasted twenty-five years. Then the railway's senior western engineer, John Edward Schwitzer, rejected the avalanche-prone valley walls and chose something stranger: two tunnels bored in three-quarter circles, one into Cathedral Mountain and one into Mount Ogden. Each time, the track turns back and passes beneath itself. About a thousand men built them for around one and a half million dollars. On September 1, 1909, the Spiral Tunnels opened, and the grade was cut in half.
Schwitzer barely outlived his triumph. Named chief engineer in January 1911, he died of pneumonia weeks later.
His loops are still working. Wait here for a long freight, and you may watch its locomotives come out of the mountain and pass beneath the very train they are pulling.