# Racing the Sunrise Up Fuji's Busiest Trail, Now Through a Gate

Night climbers, sunrise crowds and the 2024 gate that Yamanashi built on Mount Fuji's most popular trail.

- Location: Fuji Subaru Line 5th Station, Fujiyoshida, Yamanashi, Japan
- Topics: sports, nature, notable_landmarks, culture
- Web page: https://tourpods.com/stories/racing-the-sunrise-up-fuji-s-busiest-trail-now-through-a-gate
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- The Yoshida Trail is the most popular of the four routes to the summit of Mount Fuji.
- About 221,000 people climbed Mount Fuji in 2023, and 62 percent of them used the Yoshida Trail, according to Ministry of the Environment figures.
- The Yoshida Trail's trailhead is the Fuji Subaru Line 5th Station, at an elevation of 2,305 meters.
- The Fuji Subaru Line, a toll road of about 29.5 kilometers ending at the 5th Station, opened on April 1, 1964.
- The summit of Mount Fuji is 3,776 meters high.
- The Yoshida Trail's climbing season runs from July 1 to September 10, and the opening can be delayed by weather or lingering snow.
- The sunrise seen from Fuji is called goraiko, roughly "arrival of light," and most Japanese climbers hike at night to reach the summit near sunrise.
- Yamanashi's tourism office advises climbers to reach their mountain hut by about 4 p.m., and many climbers wake from about 2 a.m. to reach the summit for sunrise; the trail above the 9th Station becomes extremely crowded at night.

## Story

It is two in the morning, and the side of Mount Fuji is moving. A chain of headlamps snakes up the dark slope above the 9th Station, climbers nearly shoulder to shoulder, all racing the same deadline: the sun.

The Japanese call it goraiko, roughly "the arrival of light," and most Japanese climbers hike through the night to meet it on the summit, 3,776 meters up. The Yoshida Trail is the most popular of Fuji's four routes; in 2023, 62 percent of the mountain's 221,000 climbers chose it. It begins at the Fuji Subaru Line 5th Station, 2,305 meters up, where a toll road opened in 1964 delivers buses straight into thin air.

The window is short. The trail opens July 1, later if snow lingers, and closes September 10. The sensible plan is to climb in the afternoon, reach a reserved mountain hut by about four, sleep a little, and rise around two for the final push.

Plenty of people skipped the sleep. Bullet climbers stormed up overnight with no hut booked, chasing the sunrise and courting altitude sickness and hypothermia. Some slept on the trail or lit fires for warmth. Yamanashi's governor warned that Mount Fuji was screaming.

In June 2024, the prefecture answered with a gate at the 5th Station: a 2,000-yen fee, a cap of 4,000 climbers a day, and a lockout from 4 p.m. to 3 a.m. for anyone without a hut reservation. Staff at the gate could also turn back the unprepared. Governor Kotaro Nagasaki came up to see it, saying the point was to let everyone, Japanese and foreign, truly enjoy the mountain.

That summer, the climber count fell about 14 percent. For 2025, Yamanashi doubled the fee to 4,000 yen and moved the gate's closing to 2 p.m.

The arrival of light is still free. But the climb toward it now starts at a ticket gate, and with a bedtime.

More stories in Fujiyoshida, Yamanashi: https://tourpods.com/country/jp/city/fujiyoshida-jp.md
