Pocinho, Where the Douro Line Stops Short of Spain

Pocinho, Where the Douro Line Stops Short of Spain

How the Douro railway reached Spain in 1887, and why its trains have turned back at Pocinho since 1988.

📍 Vila Nova de Foz Côa, Guarda

TechnologyHistory

Listen to this story, narrated, in the TourPods app.

Your first 20 stories are free — no credit card required.

Download free

Key facts

  • The Douro line opened in stages, beginning with Ermesinde–Penafiel on 29 July 1875.
  • The line reached Régua on 15 July 1879, Pinhão on 1 June 1880, and Tua on 1 September 1883.
  • The Tua–Pocinho section opened on 10 January 1887, and Pocinho was the temporary terminus until the section to Côa opened on 5 May 1887.
  • The Côa–Barca d'Alva section opened on 9 December 1887, and the international link from Barca d'Alva to La Fregeneda in Spain opened the same day.
  • The line was meant as an alternative to river transport on the poorly navigable Douro, to improve access to Trás-os-Montes, and to carry fertilizers and seeds inland and agricultural produce out.
  • The line's tunnels include the Juncal tunnel (1,621 m), the Saião tunnel (752 m) and the Valeira tunnel (712 m).
  • The Ferradosa railway bridge carries the line across the Douro River.
  • On 5 January 1940 a landslide between Covelinhas and Gouvinhas sent locomotive No. 248 into the river, killing the driver and the fireman.

Read the story

At Pocinho, the trains from Porto stop and turn around. The track used to keep going, east along the river to the Spanish border. Since the autumn of 1988, nothing has run on it.

It took twelve years to push the railway that far. Starting in 1875, the Douro line crept upriver a stage at a time: Régua in 1879, Pinhão in 1880, Tua in 1883. The goal was to beat the river. The Douro was a poor highway for trade, and the valley's villages needed a way to bring fertilizer and seed in and carry their harvests out.

The route was relentless. Hugging the water, the line burrowed through tunnel after tunnel, the longest at Juncal running more than sixteen hundred meters, and crossed the Douro itself on the bridge at Ferradosa. Even finished, the slopes fought back. In January 1940, a landslide threw a locomotive into the river, killing its driver and fireman.

Pocinho got its first train on January 10, 1887, and was briefly the end of the line. On December 9 that year, the rails reached Barca d'Alva and linked to Spain the same day.

Pocinho became a junction. In the 1950s, narrow-gauge trains on the Sabor line brought iron ore from the Reboredo mines, and men here moved it into broad-gauge wagons bound for the port of Leixões and Britain. Albino Teixeira, a retired railwayman, remembered workers stripped to the waist in the heat and dust, and called it authentic slavery.

Then the traffic drained away. Spain closed its side of the link at the start of 1985. On October 18, 1988, Portugal shut the stretch from Pocinho to Barca d'Alva, a decision tied to a government strategy that favored motorways over rail.

In 2021, Portugal's parliament voted unanimously to call for the line's reopening. Until that happens, Pocinho remains what 1988 made it: the end of a railway that was built to go further.