Read the story
Drive north toward Obhur and you can't miss it: a concrete stalk rising out of the flat coastal plain, still unfinished, still climbing. It is meant to keep going until it crosses a line no building has ever crossed. One kilometer.
The shape came from a studio in Chicago. Adrian Smith had already designed the Burj Khalifa as a partner at Skidmore, Owings and Merrill. With his own firm and partner Gordon Gill, he drew a tower meant to top his earlier record by at least 173 meters. The architects say it evokes "a bundle of leaves shooting up from the ground," like the folded fronds of a young desert plant. Its three tapering wings aren't only poetry; the firm says they help the tower shrug off the wind that pushes on anything this tall.
The owner was Kingdom Holding, chaired by Prince Alwaleed bin Talal, building through Jeddah Economic Company. Construction began in 2013, and by 2014 the tower was rising above ground.
Then the climb stopped. In November 2017, an anti-corruption committee led by Crown Prince Mohammed bin Salman began detaining princes, ministers and businesspeople, among them Alwaleed and Bakr bin Laden, chairman of the tower's main contractor, the Saudi Binladin Group. In January 2018, with roughly a third of the structure done, the developer halted concrete work, reportedly over labor issues with a contractor. For years, the stump simply stood.
The silence broke slowly. In 2023, a trade publication reported the project was restarting, and contractors were invited to bid. In January 2025, work officially resumed. By September 2026, the architects were reporting 113 floors and 454 meters.
If current estimates hold, it will be finished around 2028, and visitors will step onto a public sky terrace on level 157, beneath what is planned as the world's highest observatory.
Until then, it remains a promise in concrete: a desert plant, reaching for a height no one has ever built.