# Eighteen Towers and One Meter of Humility

How Gaudí's tallest tower finally topped out in 2026, deliberately stopping just short of Montjuïc.

- Location: Tower of Jesus Christ, Barcelona, Catalonia, Spain
- Topics: architecture, history, notable_landmarks
- Web page: https://tourpods.com/stories/eighteen-towers-and-one-meter-of-humility
- Listen: narrated audio in the TourPods iOS app (https://apps.apple.com/app/tourpods)

## Key facts

- Gaudí's design calls for 18 towers, and as of 2026, 14 are complete.
- The 18 towers represent the 12 apostles, the 4 evangelists, the Virgin Mary and, tallest at the center, Jesus Christ.
- The Tower of Jesus Christ is 172.5 meters tall (7.5 x 23); Gaudí reduced a planned 180 meters (7.5 x 24) so the building would not exceed Montjuïc.
- Gaudí held that man's construction could not surpass God's; Montjuïc hill is about one meter taller than the Tower of Jesus Christ.
- The pinnacle of the Saint Barnabas tower on the Nativity façade was finished in November 1925, while the other three Nativity towers were nearly finished.
- Gaudí had finished the graphical structural calculations for the main tower's lantern; his collaborators drew the large plans on the floor.
- On 29 November 2021, a 7-meter twelve-pointed illuminated crystal star was lifted onto the Tower of the Virgin Mary as its final piece.
- The Tower of the Virgin Mary was inaugurated on 8 December 2021 with a mass, a blessing and the first lighting of the star; at 138 meters it is the basilica's second-tallest tower.

## Story

Antoni Gaudí wanted his church to stop one step short of heaven, or at least one step short of Montjuïc.

To Gaudí, the hill over Barcelona was God's work. When he set the height of his tallest tower, the Tower of Jesus Christ, he trimmed it from a hundred and eighty meters to a hundred and seventy-two and a half, leaving the hill about a meter taller. Man's construction, he held, could not surpass God's.

His plan called for eighteen towers: twelve for the apostles, four for the evangelists, one for the Virgin Mary, and the tallest, for Jesus, at the center. In his lifetime only one was finished, the tower of Saint Barnabas on the Nativity facade, topped out in November 1925. For the great central tower, Gaudí left calculations drawn so large that his collaborators laid the plans out on the floor.

Nearly a century later, the center finally began to fill. On November 29, 2021, a seven-meter, twelve-pointed crystal star was lifted onto the Tower of the Virgin Mary, and on December 8 it was lit for the first time, a hundred and thirty-eight meters up. The evangelists followed: Luke and Mark in 2022, Matthew and John in 2023, all four inaugurated that November.

That left Jesus. On October 30, 2025, the rising tower passed Germany's Ulm Minster, making this the world's tallest church. On February 20, 2026, crews set the upper arm of the cross in place, completing the tower's exterior at full height. And on June 10, 2026, a hundred years after Gaudí's death, Pope Leo XIV blessed the tower, and it was lit for the first time.

Fourteen of the eighteen towers now stand. The last four belong to apostles on the unbuilt Glory facade.

Look toward Montjuïc. After more than a century of building, the church has finally reached its full height, and it still bows to the hill by a single meter.

More stories in Barcelona, Catalonia: https://tourpods.com/country/es/city/barcelona-es.md
